Tuesday, September 28, 2004

Substrate and Membrane.


Study roof ready for Formshield touch up.

Tuesday, September 21, 2004


Planter Troughs membraned prior to installation.

Hitchins Unishield over ply substrate

More edge detail ready for Hitchins "Formshield" touchup.

Outlet & upstands.

Monday, September 20, 2004


Pre membraned water outlet destined to drain Balcony

Water Outlet Epoxied into position.

Upstand junction details. H3 coving treated with "Evidure",cured, then cast/fastened into thickened epoxy over epoxy wetted out fibreglass tape. Bomb-proof !

Fibreglass tape heated into resin ,followed by thickened epoxy fill coat.

"West System" Epoxy resin heated into rebate.

Key slot routered into ply junction.

Fixing ply.

Start of Ply screwed with SS screws & bonded with Gorilla grip.

Sunday, September 19, 2004


Window 6 with downpipe position

Structure.


Study/porch flatroof framing with groovy steel post to beam junction.

View looking North.

House with all framework up.

Deck plates treated with metalex after machining , then fastened with greased coach screws.

Prefabricating deck panels.

Kneebeams installed.

Installing Kneebeams.

Garage wall progressing

Polehenge.

Reinforced concrete block wall on gridline 's'.

Garage Slab ready for blockwork.

More groundbeams.

Groundbeam steel / footings on gridline "S".

Windows 16 / 17 and flat roof overhang suggesting downpipe position dropping down vertically from from yet to be installed gutter.

Tuesday, September 07, 2004


Pile holes .5m X 2m deep, prior to steel cage / concrete fill.

Friday, September 03, 2004


Dave burying local vampire.

Thursday, September 02, 2004


More Profiles.

Wednesday, September 01, 2004


Setting up Profiles.