Tuesday, March 21, 2006


floor

Friday, October 28, 2005


Origi-ma-jig

Thursday, October 27, 2005

stairs

Stairs


Red centre

Wednesday, October 26, 2005


Big red

Friday, September 16, 2005


Trial for Rowan

James doing final sand to gib stopping.

Wednesday, August 31, 2005


Drawing Master bedroom Entrance

Monday, August 22, 2005


Speaker wires & framing in firebox recess.

Saturday, August 13, 2005


General arangement : D21 to ground, gully trap, gas HW, garage entrance.

Ground level to 21

Gully trap near Southern deck .

Sunday, July 31, 2005

Attention :Tim Carpenter


Further fastenings to Gib. Master bedroom, 600mm east of gridline N , level 10.

Another image of aditional gib fastenings in master bedroom

Additional fastenings to inside face of small study wall

Additional fastenings applied to outside face of wall , of upstairs study.

Ensuite Bathroom lining.Aditional edge fastening.

Sunday, July 24, 2005


Guest bathroom / shower plumbing

Laundry plumbing.

Level zero toilet basin plumbing.

Level zero toilet plumbing

Tuesday, July 19, 2005


Ensuite shower plumbing.

Even more Kitchen plumbing

More Kitchen Plumbing.

Kitchen Plumbing

Wednesday, July 06, 2005


View from North East.

Monday, June 20, 2005


Ply on the line of "C"

Door 9

Door 9

Doors 9 & 12

Thursday, June 09, 2005


Dining room rafters with shiny 6 kn tie downs.

Wednesday, June 01, 2005


Level 6 bracing, Gridline E, East end

Level 6 Bracing , griline E, West end.

Sunday, May 22, 2005

Door 21


Door 21
Centre of lever door handle 1150 off floor !!!!

Wednesday, May 18, 2005

Entry to bedrooms 2 & 3


HoJo
( double left click to enlarge image)
Indistinct numbers are as follows
Top : 2500 ( width of lowered section of ceiling)
Bottom row : 180 , 880 , 480 , 880 , 80 .

Thursday, April 14, 2005


Rainhead.

Wednesday, April 13, 2005


Gas hot water heater.

Monday, February 07, 2005


Main roof gutter / soffit detail,and proposal #1 rain head.

Main roof Rain head location.

Tuesday, February 01, 2005


livingroom windows ply flashing / packers bonded & screwed to main steel and timber structural frame.

Slotted Bottom cavity baton for ply & baton wall cladding junction with membrane roof upstand .

Insulation installed under master bathroom floor.

Sill and ply rebate /seal detail for main living room windows.

Head & jamb flashing detail.

Window sill flashing details

Tuesday, December 21, 2004


Internal junction D12, W13, W32, W33

W 32 installed.

W 32 flashing.

W 32 Flashing.

W 32 Flashing.